Section 4 is ready to leave the garage , so need to make space outside . Removed section 2 of the hull from the rotate cradle and moved the cradle back round the front yard , rotated and positioned in place above Section 3 that has been sitting ready for it .
Time to rock and roll:
Bit by bit , up she goes
Taking my time , slowely but surely
Balance point now , time to move the chain from the pull side to the brake side
Now back down the other side ( nice and slowely ) . Chain has been attached to the reverse upper point on the cradle .
Almost there !
Phew !! , Down !! , and no crash this time !!
Now that this piece is the right side up , can now fit more of the internal structure , plywood bracing floors added to the frames , internal structual keel and the false floor supports . As this is one of the middle sections of the hull , not much in the way of hull shape changes , put plenty of space . This is the port hull , this section ( roughly 7 ft by 16 ft ) will contain a small workshop area , in the starboard hull it contains a utility room under the main kitchen area for processing of laundry etc . There is more hull side to be added ( 24 " on the outer side ) , and it will end up with 6 ' 6 " of usable headroom . This side meets up with the 45 degree section of the wingdeck , fully loaded displacement waterline is approx 12" up from the chine .
Sunday, 22 March 2015
Sunday, 1 March 2015
ITS A BIG JOB ( messy too )
Plywood skinning of the stern section is now complete , so now adding the fiberglass outer layer .
Such a shame to cover up shaped plywood , it looks so pretty , oh well , only the fish'es would have noticed anyway .
I,m still working on my own so have had to work out an appropriate sequence for the fiberglass operation , to start with I cut an appropriate length of glass ( 400g biaxial ) from the roll ( 5 meters in this case ) and roll it onto a length of pipe . After mixing up a batch of resin/hardner ( 1.2 Liters ) , using a paint roller I make an initial resin coverage of the plywood area to be fiberglassed , I prefer the wet system of layup as it helps hold the cloth in place . Taking the cut cloth I then proceed to roll it over the wet resin taking care to stretch and position it correctly , the resin easily holds it in place and this normally works out quite smoothly . Mixing up more resin I then continue to wet out the cloth fully ( but not too much resin as there is more to come ) .
Time for Lunch ( man has to eat )
Once the resin starts to get really sticky , its time for the Peel ply to be added , I mark out the locations of each piece of peelply on the hull to make it easier to apply a thin coat of resin to the appropriate location , the peelply operation takes time so I do separate pieces rather than the entire section at once , Next job is to mix enough resin for a couple of widths of peelply and apply a thin coat to the marked out area's . During Lunch ( got to be organised ! ) I have cut the peelply and also rolled it over a length of pipe , using this I apply the peelply , stretching it out as I go , then using some plastic flat edges I stretch out the peelply as much as possible , working out any excess resin ,then repeating this peelply operation until the entire area is complete .
Three or Four hours later when the resin has gotten hard , I then trim off any excess cloth etc , its better to do it now as its too damn hard when fully cured .
This is the external side , did it first as it only has partial coverage ( split skin on this side ) and its easier as only 900 mm of cloth width its used , did this one yesterday so I've already removed the peelply .
Did the second side today , its larger and uses the full width of cloth ( 1.27m ) , its still got the peelply attached .
As you can see , its a bit tight in the garage ,should have built a bigger one !! ( garage that is , the boats big enough as it is !! )
Next chance I get , it will be fiberglassing the bottom of the boat , it will partially overlay the sides as well so we end up with two complete layers of cloth on the chine area .
Such a shame to cover up shaped plywood , it looks so pretty , oh well , only the fish'es would have noticed anyway .
I,m still working on my own so have had to work out an appropriate sequence for the fiberglass operation , to start with I cut an appropriate length of glass ( 400g biaxial ) from the roll ( 5 meters in this case ) and roll it onto a length of pipe . After mixing up a batch of resin/hardner ( 1.2 Liters ) , using a paint roller I make an initial resin coverage of the plywood area to be fiberglassed , I prefer the wet system of layup as it helps hold the cloth in place . Taking the cut cloth I then proceed to roll it over the wet resin taking care to stretch and position it correctly , the resin easily holds it in place and this normally works out quite smoothly . Mixing up more resin I then continue to wet out the cloth fully ( but not too much resin as there is more to come ) .
Time for Lunch ( man has to eat )
Once the resin starts to get really sticky , its time for the Peel ply to be added , I mark out the locations of each piece of peelply on the hull to make it easier to apply a thin coat of resin to the appropriate location , the peelply operation takes time so I do separate pieces rather than the entire section at once , Next job is to mix enough resin for a couple of widths of peelply and apply a thin coat to the marked out area's . During Lunch ( got to be organised ! ) I have cut the peelply and also rolled it over a length of pipe , using this I apply the peelply , stretching it out as I go , then using some plastic flat edges I stretch out the peelply as much as possible , working out any excess resin ,then repeating this peelply operation until the entire area is complete .
Three or Four hours later when the resin has gotten hard , I then trim off any excess cloth etc , its better to do it now as its too damn hard when fully cured .
This is the external side , did it first as it only has partial coverage ( split skin on this side ) and its easier as only 900 mm of cloth width its used , did this one yesterday so I've already removed the peelply .
Did the second side today , its larger and uses the full width of cloth ( 1.27m ) , its still got the peelply attached .
As you can see , its a bit tight in the garage ,should have built a bigger one !! ( garage that is , the boats big enough as it is !! )
Next chance I get , it will be fiberglassing the bottom of the boat , it will partially overlay the sides as well so we end up with two complete layers of cloth on the chine area .
Tuesday, 27 January 2015
Cheating with the Stern Section
I added a prop tunnel to jigsaw to minimize draft and give added protection to the Propeller , but the practicality of creating the tunnel in complex compound curves out of sheet plywood while possible , is not easy . Therefore I cheated ! . The basic cutout in the hull is formed by flat layers of sheet plywood in a basic shape , thus creating the structural base of the entity , the final shape will be created later out of fiberglass and foam , much easier in this medium . I used a similar technique on the conical bow sections but that was a single curve where this is a compound ( 2 directions ) curve therefore more flexibility was required.
As you can see we also have a much curvier hull shape compared to the earlier 2 sections , as the hull lines make their way back up to the stern ,nice to see as straight lines are so boring.
This is only the first skin layer , still another to add , the second skin covers the edge of the first so as to increase strength and minimize the exposed edge of the ply , still its all covered with layers of fiberglass later anyway .
In the first picture you can just make out a bolt emanating from the front of this section , this is the keel height as taken from the previous section , by the time it reaches the tunnel and propeller position it will be almost 800 mm from the base of the tunnel , not inconsiderable .
I had toyed with the idea of a propeller strut instead of a full keel but stuck with it as it gives more protection and at the design cruising speed of 6 knots shouldn't affect the propeller efficiency too much .
As you can see we also have a much curvier hull shape compared to the earlier 2 sections , as the hull lines make their way back up to the stern ,nice to see as straight lines are so boring.
This is only the first skin layer , still another to add , the second skin covers the edge of the first so as to increase strength and minimize the exposed edge of the ply , still its all covered with layers of fiberglass later anyway .
In the first picture you can just make out a bolt emanating from the front of this section , this is the keel height as taken from the previous section , by the time it reaches the tunnel and propeller position it will be almost 800 mm from the base of the tunnel , not inconsiderable .
I had toyed with the idea of a propeller strut instead of a full keel but stuck with it as it gives more protection and at the design cruising speed of 6 knots shouldn't affect the propeller efficiency too much .
Monday, 19 January 2015
HouseBoat or Boat Boat
Have been fine tuning the overall look of jigsaw , and made some changes to the upper structure design . Have edged the design away from it being just a Houseboat to more of a conventional boat in the overall look .
Propulsion system is also changed , is now a hybrid of solar , battery , diesel and electric motors .
Sounds complex but due to the large solar arrays on the top of the boat it should make for more economical operation .
Am currently working on the prop tunnel in the last section of the first hull ( pictures soon ) .
Interior layout has also changed , large workshop at the rear is now replaced with an open deck , a smaller workshop has been placed into the port hull under the Dining area . Side Decks now surround the entire lower portion . My own little ( relatively ) Mini Superyacht !
Propulsion system is also changed , is now a hybrid of solar , battery , diesel and electric motors .
Sounds complex but due to the large solar arrays on the top of the boat it should make for more economical operation .
Am currently working on the prop tunnel in the last section of the first hull ( pictures soon ) .
Interior layout has also changed , large workshop at the rear is now replaced with an open deck , a smaller workshop has been placed into the port hull under the Dining area . Side Decks now surround the entire lower portion . My own little ( relatively ) Mini Superyacht !
Sunday, 2 November 2014
Section 3 , Ready for the daylight
Section 3 is ready to see the light of day , actually has been for 3 weeks but i needed to get myself re-organised with sections 1 and 2 so i had the available space .
Moved Section 1 round the back yard and created some stands to keep it upright .
This free'd up the rotate jig so this was moved back round the front and inserted over hull section 2 , bolted it up and rotated it back to a more normal orientation . This came with a bit of drama as we had an issue with the braking line , the weight came on too fast and my daughter wasn't able to hold the hull so the first 90 degree's happened in 10 minutes and the second in 3 seconds ( OUCH ) .
Boat ended up with a cracked frame and a daughter with rope burns on her hands ( More OUCH ) .
( sorry , no pictures , was far too stressed ) .
Time to move section 3
Out it comes into the daylight .
Fully out now , time to do a bit of a tidy up , still have to remove the " Frames +1 " and clean up
the unpainted surfaces . The additional frame can be seen at the back of the hull section , its actually the first frame of the next stern section , we continue the Longitudinal stingers to this additional frame so the hull sections will be fair when they are joined . We cut it off now as its required to build the next section .
The keel runs flat from the mid-section of the boat so as you can see here ,it starts to protrude more as the hull curves back up towards the stern .
Originally i had set a timetable of 4 months for each hull section and 6 months for the bow , its taken more than this for the first 2 pieces , but at last we are getting closer to schedule , excluding the hull re-organisation , this section was basically done in the allotted time frame .
Have removed the "frames+1" and tidied up the exposed surfaces , will store this piece here until we are ready to frame up the stern section , when that happens we reposition this section back in front of the garage and connect up the two sets of frames to ensure a nice fair hull .
Back to building more frames now , stern section is slightly different as has 2 structual bulkheads , frame 17 is the separation between section 3 and the engine room and frame 20 is essentially the stern of the boat , there is also a frame 21 , but that is much smaller and is part of the step down stern platform . Need to order some more timber ( wallet opening time , OUCH )
Sunday, 25 May 2014
Oh No ! Not Again !!
Time to remove Section 2 from the Garage , Need to make room to start on the next Piece of the puzzle !
Something seems familiar about this issue ??
Luckily this section isn't as tall as the first so I was able to lower it ( get down to the ground ) to enable for it to be removed successfully .
Time to start building the next set of Frames , one Bulkhead and four open timber frames .
Something seems familiar about this issue ??
Luckily this section isn't as tall as the first so I was able to lower it ( get down to the ground ) to enable for it to be removed successfully .
Time to start building the next set of Frames , one Bulkhead and four open timber frames .
Saturday, 3 May 2014
Roll me Over , Roll me Over
Roll Me over and Do it again !
With Hull Section 2 complete I need to get Section 1 out of the way , this involves moving and rolling it over . To do this I have Built a Stonger Boat Cradle than would normally be required and to go with it , two semi - circular steel additions . Here's my boy Matthew helping by cleaning up the welds .
Next job was to roll it over , now where's that boat gone , must be around here somewhere ?
Moved the Hull Section 1 into the upside down cradle and started the turning process .
With Hull Section 2 complete I need to get Section 1 out of the way , this involves moving and rolling it over . To do this I have Built a Stonger Boat Cradle than would normally be required and to go with it , two semi - circular steel additions . Here's my boy Matthew helping by cleaning up the welds .
Next job was to roll it over , now where's that boat gone , must be around here somewhere ?
Moved the Hull Section 1 into the upside down cradle and started the turning process .
Bit by bit and Slowely it rolls over
So thats what it looks like from underneath , havn't seen that side of it before !
Half Way now , if anything goes wrong with this I will not be Happy !
The Inside ( or under side ) , or What ever you want to call it
Now we are on the Downward slope , glad its a Big Strong Chain ! .
While I'm on the Chain My Daughter Sam is on the Safety lines , thanks Sam
Phew , Finally over and as the Sun sets I can finally Relax
Just enough light to do a Titanic ( I'm Flying ) on the Bow ( Kids !! )
Subscribe to:
Posts (Atom)